Ij
8
Delftlanden
Setting
Client
cross section, scale 1:100
This cyclist and pedestrian bridge crosses the Emmen by-pass
Emmen City Council
and connects the Delftlanden housing development with the
Designers
existing town.
Gerhard Nijenhuis
Design
Rogier van Nassau
Completed
• The bridge design is location-based: the curve creates the
2005
most logical route between the housing development and
Size
the city centre. The central reservation offered the best loca-
l=84 m; b= 4 m
tion for a bridge support. Because the bridge was required to
Building costs
be an icon in the surrounding landscape, designing a cable-
€ 725,600
stayed bridge was the obvious choice.
Price per m²
• Specially designed supports carry the bridge on both sides
€ 2,160
Load-bearing capacity
of the by-pass, ensuring that motorists are not deprived of
5 kN/m²
a view of the countryside. The bridge does not end until the
end of the curve, where the elevated cyclist and pedestrian
path continues onto the embankment.
Structure
• The main structure comprises a steel tower, 14 steel cables
and an 80-metre-long tubular steel beam with cross beams
attached to one side. The tower leans slightly rearwards,
away from the bridge deck, in order to keep it balanced. In
this way, the bridge’s central weight is located directly above
the tower foot.
• The Delftlanden bridge is a multispan bridge; the cable sus-
pended bridge is the main span, and smaller girder bridge
sections on steel supports cross the other, smaller spans. Like
the tower, these specially designed supports lean slightly
backwards.
102
Delftlanden, Emmen
103
8
Detailing
• Several decimetres separate the bridge deck from its
neighbouring tubular steel beam, which means the beam is
clearly visible from the bridge itself, and from underneath the
bridge, where a strip of light is visible.
• Specially designed ball joints connect the steel cables to the
tubular beam, which allows for small movements of the
bridge deck and cables.
• The handrails are made of aluminium extrusion profiles,
developed especially for this project. Aluminium was chosen
as the construction material, because it allowed for the hand-
rail to be oval-shaped and for the simultaneous integration
of the handrail and baluster fitting.
plan
elevation
104
the cables carry the tubular beam
cable connection cross section
ball joint
Delftlanden, Emmen
105